Roadworks Report Week Commencing : 8th August 2020 CHESTER-LE-STREET Road […]
Roadworks Report | Week Commencing : 8th August 2020 | |||||||||
CHESTER-LE-STREET | ||||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | |||
A183 | Chester Road, Bournmoor | Housing development – new water supply | 2 way lights manual control at peak times | 20 July | 14 August | Northumbrian Water | CLS | |||
A693 | Blind Lane, Chester-le-Street | Carriageway resurfacing | Road closure (8:00pm to 6:00am) | 15 September | 19 September | Durham County Council | CLS | |||
A1052 / B1284 / C8b | Pithouse Lane Junction and Lumley New Road Junction, Woodstone Village | carriageway patching | 3 way rolling lights (7:30am to 3:30pm) manual control | 17 August | 19 August | Durham County Council | CLS | |||
B6313 | Pelton Fell Road, Pelton Fell | Housing development – new sewer connection | 2/3 way lights as required | 6 July | 11 September | Taylor Wimpey | CLS | |||
C184 | Newcastle Road, Hillside & Police Station, Chester-le-Street | Sewer repairs | 4 way lights manual control at peak times | 20 August | 3 September | Northumbrian Water | CLS | |||
C12 | Holmhill Lane, Chester Moor | Railway bridge inspection | Road closure (7:00am to 3:00pm) | 23 August | 23 August | Network Rail | CLS | |||
Unclassified + Footpath 31 | Picktree Lodge, Chester-le-Street | A1(M) Vigo Railway Bridge works | Exit link road closure plus suspension of one-way and footpath closure | 8 September 2019 | November 2020 | Highways England | CLS | |||
Unclassified | Middle Chare, High Chare, Chester-le-Street | Restriction to enable pedestrian social distancing | Road closure | 15 June | 10 September | Durham County Council | CLS | |||
Unclassified | Station Road, Chester-le-Street | Restriction to enable pedestrian social distancing | Westbound Road closure | 15 June | 10 September | Durham County Council | CLS | |||
Unclassified | A167 to Waldridge Road link, Chester-le-Street | Street lighting works | 2 way lights (9:00am to 3:30pm) | 10 August | 12 August | Durham County Council | CLS | |||
Unclassified | The Avenue, Chester-le-Street | Street lighting works | 2 way lights (9:00am to 3:00pm) | 14 August | 14 August | Durham County Council | CLS | |||
Footpath 3 and 4 | North of Trent Crescent, Great Lumley | Housing development | Footpath closure | 20 June 2018 | December 2021 | Bellway Homes | CLS | |||
Various | Throughout Chester-le-Street area | Micro asphalt surfacing and Surface Dressing | Road closures, 40mph/10mph speed limit as required | April 2020 | August 2020 | Durham County Council | CLS | |||
Various | Throughout Chester-le-Street area | Minor maintenance, patching | Localised traffic control, traffic lights as required | Ongoing | Ongoing | Durham County Council | CLS |
Derwentside Area (West) | ||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | |
A692 | Front Street, Hobson | Prep works for resurfacing works | 2 way lights | 27 July | 7 August | Durham County Council | DER(W) | |
A692 | Front Street, Dipton | Carriageway resurfacing works | Road Closure – 9:00am till 3:00pm | 5 August | 14 August | Durham County Council | DER(W) | |
A692 / B6173 | Front Street, Hobson, junction with Clough Dene Tantobie | Carriageway resurfacing works | Road Closure – 9:00am till 3:00pm | 13 August | 23 August | Durham County Council | DER(W) | |
A692 / B6173 | Front Street, Hobson, junction with Clough Dene Tantobie and Syke Road, Burnopfield. | Carriageway resurfacing works | 4 way lights – off peak 9:30am till 3:30pm | 11 August | 12 August | Durham County Council | DER(W) | |
A6076 | Howden Bank, Lanchester | Vegetation management | 2 way lights (9:00am till 2:00pm) | 11 August | 11 August | Northern Powergrid | DER(W) | |
A691 | From Gorecock Lane junction to A6076 Howden Bank junction, Lanchester. | Renew main | 2 way lights | 10 August | 23 August | Northern Gas Networks | DER(W) | |
B6313 | Middles Road, The Middles, Stanley | Micro Asphalt Patching | 3 way signals | 10 August | 10 August | Durham County Council | DER(W) | |
B6302 / Unclassified 19.15 | Newhouse Road junction with Cliffords Bank, Cornsay Colliery | Micro Asphalt Patching | 3 way signals | 6 August | 7 August | Durham County Council | DER(W) | |
B6301 | Ford Road, Lanchester | Reset Hydrant | 2 way lights | 3 August | 7 August | Northumbrian Water | DER(W) | |
B6296 | Cadger Bank, Lanchester | CCTV Investigation works | 3 way lights | 10 August | 21 August | Durham County Council | DER(W) | |
C131 | Pemberton Road, Consett | Install new ducting and cabling | 2 way lights | 24 August | 26 August | BT | DER(W) | |
C62 | Low Moor Road, Langley Park | Carriageway patching | 2 way lights | 13 August | 14 August | Durham County Council | DER(W) | |
C11 | Road from Holmside through Edmondsley, Edmondsley. | Bridge repairs | 2 way lights | 6 August | 17 August | Durham County Council | DER(W) | |
C11 | Road from Holmside through Edmondsley, Edmondsley. | Pole Testing | Road Closure | 14 October | 14 October | BT | DER(W) | |
Unclassified 19.15 | Wallnook Lane, Langley Park. | Unsafe bridge | Road Closure | February 2013 | Ongoing | Durham County Council | DER(W) | |
Unclassified | Clarence Gardens, Consett | water supplly renewal works | Road Closure | 3 August | 7 August | Northumbrian Water | DER(W) | |
Unclassified | Walton Terrace(back), Consett | Sewer repairs | Road Closure | 10 August | 14 August | Northumbrian Water | DER(W) | |
Footpath | Chaytor Road, Maple Gardens, South View, Cortland Road, Highridge, Cragside Court, Melrose Court, Millfield Court, Glenluce Court, Kilchurn, Felltop, Braemar Court, Phoenix Court, Consett | New ducting Installation | Footpath Closure | 17 July | 17 August | Virgin Media | DER(W) | |
Footpath | Percy Terrace, Ramsey Terrace, Percy Gardens, Iveston Road, Castledene Road, Stockerley Road, Lambton Avenue, Shatoe Close, Pontop View, Woodside Drive, Salem Avenue, Woody Close, Delves Lane. | New ducting Installation | Footpath Closure | 10 August | 8 September | Virgin Media | DER(W) | |
Unclassified | Thorneyholme Terrace, Stanley | Redirect Surface water sewer | Road Closure | 17 August | 21 August | Northumbrian Water | DER(W) | |
Various | Throughout area | Minor maintenance and patching works | As required | Ongoing | Ongoing | Durham County Council | DER(W) |
DURHAM (CENTRAL & EAST) | |||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | ||
A177 / A688 | A1(M) roundabout (Junction 61), Bowburn | Street lighting works | Lane restrictions (8:00pm to 6:00am) | 19 August | 26 August | Durham County Council | DUR | ||
A691 | Lanchester Road, Sniperley (Trouts Lane to Park and Ride Roundabout) | Gas main upgrade | 2 way lights (8:00pm to 6:00am) | 3 August | 4 September | Northern Gas Networks | DUR | ||
B1283 | Front Street, Sherburn | New connection | 2 way lights | 10 August | 14 August | Northumbrian Water | DUR | ||
C12a | Between Grange Park Crescent and Carlin Close junctions, Bowburn | New gas supply | 2 way lights | 18 August | 27 August | Northern Gas Networks | DUR | ||
C12 | Pit Lane, Newton Hall | Replace telecom pole | 2 way lights (9:30am to 3:00pm) manual control | 28 August | 28 August | British Telecom | DUR | ||
C12 | From C12A Cocken Road junction to Red House Roundabout, Newton Hall. | Gas disconnection | 2 way lights | 1 September | 9 September | Northern Gas Networks | DUR | ||
C60 | Crime Rigg Bank, Shadforth | New gas supply | 2 way lights | 5 August | 11 August | Northern Gas Networks | DUR | ||
C60 / Unclassified 20.16 | Newby Lane, Hallgarth Lane, Coalford Lane, Hallgarth View, High Pittington | Gas main upgrade | 4 way lights | 6 August | 4 September | Northern Gas Networks | DUR | ||
C98 | New Elvet, Durham City | Essential bridge maintenance works | Road closure | 20 July | September 2021 | Durham County Council | DUR | ||
C100 | Front Street, Framwelgate Moor to Pity Me | Emergency Cycle Lane provision | 2 way rolling lights (7:30am to 4:00pm) | 10 August | 28 August | Durham County Council | DUR | ||
Unclassified 19.12 | Potterhouse Lane, Pity Me | Controlled access to Recycling Centre | Westbound road closure as required | 18 May | September 2020 | Durham County Council | EAS | ||
Unclassified 19.12 | Trouts Lane, Witton Gilbert | New gas supply | 2 way lights manual control at peak times | 7 September | 11 September | Energy Assets Networks Ltd | EAS | ||
Unclassified 27.2 | Hett Mill level crossing | Drainage works | Road closure (11:00pm Saturday to 8:00am Sunday only) | 1 August | 6 September | Network Rail | DUR | ||
Unclassified 27.2 | Hett Mill level crossing | Level crossing works | 2 way lights to stop traffic as required (15mins max) 00:30am to 06:40am Sundays only | 13 September | 20 September | Network Rail | DUR | ||
Unclassified | Framwelgate Waterside, Durham City | Milburngate Development | Parking restriction | 15 July 2019 | July 2021 | Tolent Construction Limited | DUR | ||
Unclassified | Framwelgate Waterside, Durham City | Milburngate Development | Priority traffic control plus 2 way lights (8:00am to 6:00pm Monday to Friday) | 24 January | July 2021 | Tolent Construction Limited | DUR | ||
Unclassified | Freemans Place, Walkergate, Durham City | Sewer improvement scheme | Road closure (8:00pm to 6:00am) | 20 July | 9 August | Northumbrian Water | DUR | ||
Unclassified | Freemans Place, Durham City | Crane operations | 2 way lights (6:00am to 10:00pm) | 1 August | 2 August | Kier Services | DUR | ||
Unclassified | Bede Terrace, Bowburn | Sewer repairs | 2 way lights | 31 August | 4 September | Northumbrian Water | DUR | ||
Unclassified | Burn Street, Bowburn | Sewer repairs | Road closure | 31 August | 4 September | Northumbrian Water | DUR | ||
Footpath 1 | A688 to disused railway, Bowburn | Integra 61 development | Footpath closure | 12 October 2018 | April 2021 | Systra Limited | DUR | ||
Footpath 32 | Shadforth | Dangerous bridge | Footpath closure | 13 February 2016 | February 2021 | Durham County Council | DUR | ||
Footpath 8 | Paradise Farm, Coxhoe | Dangerous bridge | Footpath closure | 31 March 2016 | February 2021 | Durham County Council | DUR | ||
Footpath 10 | A177 to sewage treatment works, Bowburn | Integra 61 development | Footpath closure | 12 October 2018 | April 2021 | Systra Limited | DUR | ||
Footpath 49 | Old Elvet to Elvet Waterside, Durham City | Building development | Footpath closure | 27 August 2019 | March 2023 | Durham University | DUR | ||
Footpath 82 | Old Durham Footbridge, Durham City | Dangerous bridge | Footpath closure | January 2013 | July 2021 | Durham County Council | DUR | ||
Footpath | Freemans Place, Durham City | Building development | Footpath closure | 9 September 2019 | September 2021 | Keir Services | DUR | ||
Various | Throughout Durham area | Micro asphalt surfacing and Surface Dressing | Road closures, 40mph/10mph speed limit as required | April 2020 | August 2020 | Durham County Council | DUR | ||
Various | Throughout Durham area | Minor maintenance, patching | Localised traffic control, traffic lights as required | Ongoing | Ongoing | Durham County Council | DUR |
Durham Area (West) | ||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | |
B6300 | Burnigill Bank, Browney lane, Meadowfield. | Uneven surface | 40mph speed limit | 26 September 2019 | 25 September 2020 | Durham County Council | DUR(W) | |
C17 | From C18 Whitehouse Lane junction to Toll House Road, Bearpark | Upgrade cycleway crossing | 2 way lights | 10 August | 21 August | Durham County Council | DUR(W) | |
Unclassified 26.6 | Brandon Lane, junction with Deerness Heights, Brandon | CCTV and sewer cleansing work | 3 way lights | 12 August | 13 August | Northumbrian Water | DUR(W) | |
Unclassified 26.2 | Wolsingham Road, Brancepeth | Tree trimming works | Road Closure 9:00am to 12:00noon | 27 August | 27 August | Northern Powergrid | DUR(W) | |
Various | Throughout area | Surface dressing works, microasphalting works | Closures and 10/40mph speed restrictions as required | May | September | Durham County Council | DUR(W) | |
Various | Throughout area | Minor maintenance and patching works | As required | Ongoing | Ongoing | Durham County Council | DUR(W) |
EASINGTON AREA | |||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | ||
A19 | Sheraton Interchange | Carriageway Surfacing and road markings | Northbound and Southbound Slip road closures (8:00pm to 6:00am) | 3 August | 14 August | Durham County Council | EAS | ||
B1280 | North Road, Wingate | Carriageway resurfacing | Road closure (7:00am to 7:00pm) | 21 August | 23 August | Durham County Council | EAS | ||
B1285 / B1432 | Stockton Road Junction, North of Cold Hesledon | Install telecom ducts | 3 way lights (9:30am to 3:30pm) | 1 September | 3 September | Virgin Media | EAS | ||
B1285 / B1432 | Stockton Road Junction, North of Cold Hesledon | New electric supply | 2 way lights (8:00am to 7:00pm) manual control at peak times | 3 August | 12 August | Northern Power Grid | EAS | ||
B1285 | Times Inn Bank, Dalton-le-Dale | Carriageway patching | 2 way lights (9:30am to 3:30pm) | 1 October | 5 October | Durham County Council | EAS | ||
B1287 | New Strangford Road, Seaham | Controlled access to Recycling Centre | 4 way lights as required | 18 May | September 2020 | Durham County Council | EAS | ||
B1287 | North Road, Seaham | Gas main upgrade | 2 way lights | 27 July | 4 September | Northern Gas Networks | EAS | ||
B1432 | Stockton Road, Hawthorn | Collapsed culvert | 2 way lights | 24 February | 28 August | Durham County Council | EAS | ||
Unclassified 28.12 | Passfield Way, Oakerside Drive, Peterlee | Carriagway resurfacing | Road closure (7:00am to 7:00pm) | 24 August | 26 August | Durham County Council | EAS | ||
Unclassified 28.12 | Passfield Way, Durham Way, Peterlee | Carriagway resurfacing | Road closure (7:00am to 7:00pm) | 27 August | 29 August | Durham County Council | EAS | ||
Unclassified | North Terrace (side), Seaham | Building development | Road closure | 1 May 2018 | April 2021 | Gills Fry Fry | EAS | ||
Unclassified | Truro Avenue, St Ives Place, Murton | New sewer connection | Road closure (7:30am to 5:00pm weekdays and 7:30am to 1:00pm Saturday) | 2 September 2019 | August 2020 | Esh Group | EAS | ||
Unclassified | Thomas Street, Easington Colliery | Sewer repairs | Road closure | 10 August | 14 August | Northumbrian Water | EAS | ||
Unclassified | Oakerside Drive, Helford Road, Peterlee | Street lighting works | 3 way lights (9:00am to 3:00pm) | 13 August | 13 August | Durham County Council | EAS | ||
Unclassified | Thirteenth Street, Horden | Sewer repairs | Road closure | 17 August | 21 August | Northumbrian Water | EAS | ||
Unclassified | Granville Terrace (rear), Wheatley Hill | Replace water supply | Road closure | 17 August | 21 August | Northumbrian Water | EAS | ||
Unclassified | Ash Crescent, Hawthorn Crescent, Eastfield, Thorntree Gill, Horden | Install telecom ducts | Phased Road Closure (8:00am to 5:00pm) Sundays Only | 20 August | 27 August | Virgin Media | EAS | ||
Unclassified | Potto Street, Shotton Colliery | New water supply | Road closure | 24 August | 28 August | Northumbrian Water | EAS | ||
Unclassified | Parkside Crescent, Ash Crescent, Seaham | Install telecom ducts | 3 way lights | 1 September | 3 September | Virgin Media | EAS | ||
Unclassified | Adelaide Row (rear), Seaham | Footpath works | Road closure (7:30am to 4:30pm) | 14 September | 2 October | Durham County Council | EAS | ||
Bridleway 15 | East of East Farm, Cold Hesledon | Housing development | Bridleway closure | March 2020 | September 2022 | Tolent Living | EAS | ||
Bridleway 29 | South of Murton | Business Park development | Bridleway closure | 12 August | August 2020 | Frank Shaw Associates | EAS | ||
Footpath 5 | Little Thorpe, Peterlee | Housing development | Footpath closure | 15 October 2018 | June 2021 | Tunstall Construction | EAS | ||
Footpath 8 | Coastal Path North East of Office Street, Easington Colliery | Dangerous footpath | Footpath closure | 27 November | December 2020 | Durham County Council | EAS | ||
Footpath 13 | South of Wellfield Road, Wingate | Housing development | Footpath closure | 5 March 2018 | December 2020 | Avant Homes | EAS | ||
Footpath 24 | Hesleden | Reclamation Works | Footpath closure | 5 January 2019 | January 2022 | PBU (UK) Ltd | EAS | ||
Footpath | Essington Way, Burnhope Way, Peterlee | Underpass refurbishment | Underpass closure | 27 July | 21 August | Tangent Construction | EAS | ||
Various | Throughout Easington area | Micro asphalt surfacing and Surface Dressing | Road closures, 40mph/10mph speed limit as required | April 2020 | August 2020 | Durham County Council | EAS | ||
Various | Throughout Easington area | Minor maintenance, patching | Localised traffic control, traffic lights as required | Ongoing | Ongoing | Durham County Council | EAS |
SEDGEFIELD (EAST) | |||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | ||
A1(M) / A689 | Junction 60, Bradbury | Carriageway resurfacing on slip roads | Lane closures (8:00pm to 6:00am) plus 40mph speed limit | 16 October | 3 November | Highways England | SEG | ||
A689 | West Road, Bradbury | Railway Bridge inspection | 2 way lights (10:00pm to 7:00am) | 7 August | 8 August | Network Rail | SEG | ||
B1278 | Salters Lane, Fishburn (Clervaux Terrace) | Carriageway subsidence | 2 way lights | 23 January | 28 August | Durham County Council | SEG | ||
C36 | Laurel Road, Chilton Lane to Chilton | Water main replacement | 2/3 way rolling lights | 27 July | 30 September | Northumbrian Water | SEG | ||
C36 | Laurel Road, Lilac Road, Chilton Lane to Chilton | Footpath works | 3 way lights (7:30am to 3:30pm) | 5 October | 30 October | Durham County Council | SEG | ||
C37 | Chilton Lane, Commercial Street, Chilton Lane | Water main replacement | 2/3 way rolling lights as required | 4 May | 16 October | Northumbrian Water | SEG | ||
C37 | Cleves Avenue, Ferryhill | Water main replacement | 2/3 way rolling lights | 15 July | 9 September | Northumbrian Water | SEG | ||
C37 | Bradbury to Mordon | Railway bridge inspection | 2 way lights (10:00am to 11:00am) | 28 August | 28 August | Network Rail | SEG | ||
Bridleway 42, 47 and 57 | East of Butterwick | Wind turbine damage | Bridleway closure | 26 September 2019 | October 2020 | EDF Renewables | SEG | ||
Footpath | Fishburn Woods Holdforth No 2 Railway Bridge | Bridge repairs | Footpath closure | 6 February 2018 | September 2020 | Durham County Council | SEG | ||
Footpath 16 | South of Sedgefield | Housing development | Footpath closure | 15 May 2017 | July 2021 | Storey Homes / Taylor Wimpey | SEG | ||
Footpath 24 | North Farm, Elstob | Dangerous bridge | Footpath closure | 18 August 2016 | March 2021 | Durham County Council | SEG | ||
Various | Throughout Sedgefield area | Micro asphalt surfacing and Surface Dressing | Road closures, 40mph/10mph speed limit as required | April 2020 | August 2020 | Durham County Council | SEG | ||
Various | Throughout Sedgefield area | Minor maintenance, patching | Localised traffic control, traffic lights as required | Ongoing | Ongoing | Durham County Council | SEG |
Sedgefield Area (West) | ||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | |
B6444 | Heighington Lane Level Crossing, Newton Aycliffe | Drainage Installation Works | Road Closure – 10:30pm – 06:45am | 12 August | 13 August | Network Rail | SED(W) | |
B6288 | Merrington Lane, Spennymoor | Install new main | 3 way lights | 28 August | 4 September | Northumbrian Water | SED(W) | |
C35 | Middridge Rd. Newton Aycliffe | Enabling works | 2 way lights | 15 July | 7 August | Persimmon Homes | SED(W) | |
C35 / C34 | Middridge Road/Greenfield Way junction with Burn Lane, Newton Aycliffe | Streetlighting works | 3 way lights | 10 August | 10 August | Keepmoat | SED(W) | |
Unclassified | Walkworth Lane, Spennymoor | Sewer relining works | 2 way lights | 21 August | 21 August | Northumbrian Water | SED(W) | |
Unclassified | St Andrews Lane, Spennymoor (Asda junction) | Streetlighting works | 3 way lights (9:30am to 3:30pm) Manual control | 26 August | 28 August | Durham County Council | SED(W) | |
Unclassified | St Andrews Lane, Spennymoor (Asda junction) | Streetlighting works | 3 way lights (9:30am to 3:30pm) Manual control | 2 September | 3 September | Durham County Council | SED(W) | |
Unclassified | Clarence Green and Travellers Green, Newton Aycliffe | Building works | Road Closure | 23 March | 22 September 2021 | Tolent Living | SED(W) | |
Footpath | North Eastern segregated footpath | Building renovation works | Closure | 8 June | 8 September | Allure Developments | SED(W) | |
Footpath No.6 / Footbridge No.1 | Byers Green | Temporary Footbridge and Footpath Closure | Closure | 9 December 2019 | 8 December 2021 | Durham County Council | SED(W) | |
Various | Throughout area | Surface dressing works, microasphalting works | Closures and 10/40mph speed restrictions as required | May | September | Durham County Council | SED(W) | |
Various | Throughout area | Minor maintenance and patching works | As required | Ongoing | Ongoing | Durham County Council | SED(W) |
Teesdale Area | ||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | |
A67 | Darlington Road, Barnard Castle | Renew Post | 2 way lights | 19 August | 19 August | BT | TEE | |
A67 | Main Road junction with Spa Road, North Lane and High Row (side), Gainford | CCTV and Cleansing works | 4 way lights | 27 August | 27 August | Northumbrian Water | TEE | |
A67 | Main Road, junction with Queens Court, Gainford | CCTV and Cleansing works | 3 way lights | 31 August | 31 August | Northumbrian Water | TEE | |
B6282 | California Row, Middleton in Teesdale | Sewer repairs | 2 way lights | 10 August | 12 August | Northumbrian Water | TEE | |
B6281 | Collingwood Bank, Eggleston | Retaining wall repairs | 2 way lights 9:00am till 3:00pm | 1 Sept | 2 October | Durham County Council | TEE | |
B6277 | Low Force, Bowlees | Danger from indiscriminate parking | Prohibition of parking | 5 June 2020 | 4 November 2021 | Durham County Council | TEE | |
B6277 | From Ettersgill Bridge to St James Church, Forest in Teesdale | Repairs to retaining wall | 2 way lights | 22 June | 10 August | Durham County Council | TEE | |
B6277 | From Lune Bridge to B6281 Croft Yoke Lane junction, Mickleton | Root cutting works | 2 way lights | 11 August | 11 August | Northumbrian Water | TEE | |
B6277 | From Ettersgill Bridge to St James Church, Forest in Teesdale | Repairs to retaining wall | 30mph speed restriction | 22 June | 30 August | Durham County Council | TEE | |
B6275 | From Brownside Lane junction to approx 250m South of Bolam Grange, Bolam | Repairs to wall | 2 way lights | 10 August | 13 August | Simon Makepeace | TEE | |
B6278 | Knotts Plantation, Eggleston | Collapsed cattle grid | Road closure | 6 August | 10 August | Durham County Council | TEE | |
B6282 | Eggleston to Egglesburn | Replace traffic sign | 2 way lights | 14 August | 14 August | Durham County Council | TEE | |
C31 | From C30 Harada Cottage junction to Aa68 junction (Crakehill Bank), Hamsterley | Emergency carriageway subsidence | 2 way lights | 2 June | 31 August | Durham County Council | TEE | |
C30 | Esperley lane, Cockfield | Carriageway Patching | 2 way lights | 7 August | 13 August | Durham County Council | TEE | |
C30 | From C31 junction to Unclassified 33.8 junction, Hamsterley | New service | 2 way lights | 10 August | 14 August | Northumbrian Water | TEE | |
C44 | Westwick Road, Westwick | Pole Testing | Road Closure | 14 October | 14 October | BT | TEE | |
Unclassified 117.10 | Bail Hill Bridge, Bail Hill Road, Mickleton. | 3T weight limit restriction | warning signs | July 2017 | July 2020 | Durham County Council | TEE | |
Unclassified 116.34 | Whorlton Suspension Bridge | Critical Safety Defect | Road Closure (open to cyclists and pedestrians) | 23 July | February 2021 | Durham County Council | TEE | |
Unclassified 39.4 | Marlbeck Bridge, Aukside, Middleton in Teesdale | Bridge repairs | Road Closure | 24 August | 23 October | Durham County Council | TEE | |
Unclassified | Raby Avenue (back), Barnard Castle | Service renewal | Road Closure | 10 August | 14 August | Northumbrian Water | TEE | |
Unclassified 40.5 and PROW Footpath No.4 | From C31 junction to Blackling Hole, Woodland. | Tree extraction works | Road Closure | 9 July | 8 October | Forestry England | TEE | |
Unclassified | Green Lane, Barnard Castle | New service connections | 2 way lights | 17 August | 28 August | Northern Gas Networks | TEE | |
Unclassified | North Lane, Gainford | Cabling works | Road Closure | 29 September | 1st October | BT | TEE | |
Footpath | Thorngarth Hill Footbridge, Hunderthwaite. | Unsafe Footbridge | Closure | 2 October | Oct 2020 | Durham County Council | TEE | |
Footpath No’s 8,9 & 30 | Barnard Castle. | New Housing Development | Closure | 20 March 2017 | March 2020 | Barratt Homes | TEE | |
Footpath No17 | Cockfield Fell, Cockfield | Dangerous structure | Public Right of Way Closure | 13 February | 4 September | Durham County Council | TEE | |
Various | Throughout area | Surface dressing works, microasphalting works | Closures and 10/40mph speed restrictions as required | May | September | Durham County Council | TEE | |
Various | Throughout area | Minor maintenance and patching works | As required | Ongoing | Ongoing | Durham County Council | TEE |
Wear Valley Area | ||||||||
Road No | Location | Description | Traffic Management | Start | End | Responsibility | Area | |
A689 | West Road, North Bitchburn | Carriageway repairs | 2 Way lights | 6 August | 14 August | Durham County Council | WV | |
A690 | Commercial Street, Crook | Clear blockages in ducts | 3 way lights – to be manually controlled 7:00am till 7:00pm | 12 August | 14 August | BT | WV | |
A6076 | West Auckland Road, Bishop Auckland | Recycling centre queueing | Prohibition of left turn | 29 June | TBC | Durham County Council | WV | |
A689 | St Johns Chapel to Daddry Shields | Streetlighting works | 2 way lights 9:00am till 3:00pm | 5 August | 7 August | Durham County Council | WV | |
B6299 | North Lane, Willington | Repair leak on main | 2 way lights | 4 August | 10 August | Northumbrian Water | WV | |
B6282 / C130 | Cabingate, Woodhouse Lane, St Andrews Way Cockton Hill Road, Watling Road, Bishop Auckland | Repairs to Gas Main | Road Closure | 2 August | 15 August | Northern Gas Networks | WV | |
B6278 | Crawleyside Bank, Stanhope | Safe access to underground network | 2 way lights | 11 August | 11 August | BT | WV | |
B6298 | New Road, Crook | Carriageway patching | 2 way lights (9:00am to 3:30pm) | 17 August | 19 August | Durham County Council | WV | |
C18a | Low Job’s Hill, Crook | Drainage Repairs | 2 way lights (8:00am to 4:30pm) | 3 August | 13 August | Durham County Council | WV | |
C93 | Witton Park bridge, Witton Park | Dangerous Structure | Road Closure | 30 October 2019 | Ongoing | Durham County Council | WV | |
Unclassified 41.6 | Park Road junction with ( from district boundary at the Baltic to Main Street junction), Witton Park | Water main renewal | 3 way lights | 22 June | 21 August | Northumbrian Water | WV | |
Unclassified 34.11 | From Constantine Road junction to B6286 junction, Hunwick | Overhead line refurbishment | 2 way lights | 18 August | 18 August | Northern Powergrid | WV | |
Unclassified 34.11 / Unclassified 34.12 | North Bitchburn Bank junction with Constantine Road, Hunwick | Manhole refurbishment | 3 way lights | 24 August | 24 August | Northumbrian Water | WV | |
Unclassified | New Row, Oakenshaw | New connections | Road Closure | 10 August | 12 August | Northern Powergrid | WV | |
Unclassified | Military Row, Crook. | Demolition works and redevelopment | Closure | April 2019 | April 2020 | Weardale Properties | WV | |
Footpath No.14 (Ashes House No.1 and No.2 footbridges) | Stanhope | Unsafe Footbridges | Closure | December 2018 | June 2022 | Durham County Council | WV | |
Burtree No.2 Footbridge Footpath 30 | Cowshill, Weardale | Unsafe Footbridge | Closure | 26 March | 26 September | Durham County Council | WV | |
Footpath 74 | Smiddy Burn Bridge, Stanhope | Demolish and rebuild bridge | Closure | May 2019 | Oct 2019 | Nicola Allan | WV | |
Footpath 25 | St Johns Chapel | Eroded/dangerous footpath | Closure | December 2014 | December 2020 | Durham County Council | WV | |
Footpath 132 | Witton le Wear | Adjacent Building Works | Closure | 20 July | January 2021 | Arrow Commercial | WV | |
Various | Throughout area | Surface dressing works, microasphalting works | Closures and 10/40mph speed restrictions as required | May | September | Durham County Council | WV | |
Various | Throughout area | Minor maintenance and patching works | As required | Ongoing | Ongoing | Durham County Council | WV |